An Onshore Power Supply (OPS) system is being implemented at the Port of Gdańsk, enabling vessels to use shore-side electricity while berthed.
The system is being developed at two key locations: the ferry terminal at the Westerplatte Defenders’ Quay and the T1–T5 container terminals at Baltic Hub Container Terminal.
BPR ASE GROUP is responsible for multidisciplinary coordination and technical design documentation. The project is being delivered jointly by ASE GROUP companies – EKO-KONSULT, BPR ASE GROUP and ELMECH-ASE – combining environmental, engineering and electrical power expertise.

2023–2027
investment implementation period
|