ASE GROUP

Integrated Energy System

As the General Contractor and project author, we are delivering a comprehensive implementation of a 6,6 MWt heat pump system, integrated with three cogeneration engines (3×1,1 MWt) and an electricity storage system based on LFP batteries for ENGIE EC Słupsk.

 

As part of the project, we prepared the basic design documentation, construction design, and detailed execution designs.

 

The investment is currently underway. The system uses treated wastewater as the heat source, which increases efficiency and reduces CO2 emissions. The system utilizes an eco-friendly refrigerant ammonia (NH3 ) - and a modern battery storage unit manufactured by ELMECH-ASE.

 

The project delivers gas savings of over 44% compared to traditional boilers.

Return to projects

44%

gas savings compared with traditional gas boilers.

Area:

Modern district heating systems

Project type:

EPC “turnkey”

Location:

Słupsk

Completion date:

Started in 2024 - ongoing